Concrete mixer machine js1500 installation and debugging
Time:2021-04-29

  The installation and debugging of concrete mixer machine js1500 are as below.

  Installation

  1 suggestion: all controllers should be installed in a centralized way.

  2 please refer to the attached wiring diagram to complete the following electrical components and mixer controller wiring power line (L1, 12, L3 three-phase 380V): mixer main motor and other motors, electromagnetic output cable, sensor line and hopper upper and lower limit switch wiring.
concrete mixer machine js1500

  Debugging

  1. After installation of the js1500 concrete mixer machine, recheck the correctness of all wiring, check whether there are sundries in the control box, and whether the wiring is loose or dropped.

  2. Turn on the power switch (in case of any abnormality, please turn off the power immediately and check the connection again).

  3. Turn on the power switch, press the "start" and "stop" buttons of the mixer, and try to turn the main engine (mixer). If the direction is not right, power off immediately and change the phase sequence of motor cable.

  4. Press the "up", "stop" and "down" buttons of the elevator to try to raise or lower the elevator hopper. If the direction is wrong, replace the phase sequence of motor cable.

  5. Press the "open" and "close" buttons of the main machine's material door, and test the opening and closing of the material door.

  6. Press the "add water" button to test the steering of the water pump motor. If the direction is wrong, change the motor phase sequence.

  7. Turn the "mode of production" switch to "manual", press the button switch of each scale material, and test the motor steering of each scale and the working condition of the vibrator.

  The lines above are steps for concrete mixer machine js1500 installation and debugging. If you have further questions, welcome to contact us.